STA Letter Rev2

0591-EX-ST-2013 Text Documents

Alcatel-Lucent

2013-06-27ELS_138577

                                                     June 25, 2013

          VIA ELECTRONIC FILING
          Julie Knapp
          Chief
          Federal Communications Commission
          Office of Engineering and Technology
          Federal Communications Commission
          445 12th Street, S.W.
          Washington, DC 20554

                    Re:       Special Temporary Authority for Demonstration at the Association of
                              Public—Safety Communications Officials Conference (APCO 2013)

          Dear Ms. Dortch:

                 Alcatel—Lucent seeks Experimental Special Temporary Authority ("STA") from the
          Federal Communications Commission ("Commission") to use the public safety spectrum in
          the 700 MHz Band 14 to demonstrate Long Term Evolution ("LTE") equipment in Anaheim,
          California in conjunction with the Association of Public—Safety Communications Officials
          (APCO) Conference, which will take place August 18 through August 21, 2013.

               The demonstration will conform to the following parameters:

               1. Operation will be confined to the vicinity of the Anaheim Convention Center 800 W.
                    Katella Avenue, Anaheim, CA 92802. The equipment for these operations will
                    include one base station and associated antenna located at the demonstration site,
                    along—with a maximum of 10 end user devices (portable units) operating at no more
                    than 1.0 kilometers from the base site.

                    Alcatel—Lucent requests authority to operate over the 758—768/788—798 MHz band,
                    which is currently licensed on a nationwide basis to the First Responder Network
                    Authority ("FirstNet").

                    Operation will occur between August 16. 2013 and August 21. 2013, allowing time
                    for setup and testing, demonstrations, and teardown.

                    This Experimental STA cannot be renewed. To the extent Alcatel—Lucent would like
                    to obtain additional Experimental STA use of the radio frequencies licensed to
                    FirstNet, beyond the period specified above, Alcatel—Lucent must file a separate
                    request with the FCC.

                    Alcatel—Lucent has analyzed information from the FCC‘s ULS databases and has
                    determined that the proposed operation would not interfere or create a significant
                    potential for interference with any public safety operations in the 700 MHz band.



.-'o-uo-ou-o-uun.lcc.oool-otooo.tontccco-tcc.-v'l-to"conon--u.act---uuAlcateI-Lucent @

          1100 New York Ave NW | STE 640 West           T: 202.312.5900    wwwalcatel—lucent.com
          Washington DC 20005


        Specifically, we found no active public safety licenses authorizing operation in the
        Anaheim area on frequencies that are co—channel to those proposed in this STA
        request.

   6. Temporary operations pursuant to this Experimental STA will not be used in mission—
      critical operations or in the delivery of live transmissions in duties to protect life,
      property, or safety.

   7. Alcatel—Lucent will work with other conference attendees operating pursuant to STA
        to coordinate sharing spectrum to avoid any interference issues between vendors
        operating in the above specified frequencies.

   8.    The Experimental STA will serve the public interest by providing APCO attendees
        with an opportunity to test and receive an introductory knowledge of the potential
        benefits and capabilities of a Band 14 LTE public safety network.

   For the foregoing reasons, Alcatel—Lucent respectfully requests that the Commission grant
the requested Experimental STA for the purpose of demonstrating LTE equipment at the
APCO Conference.




                                             _ ;.°s
                                              Respectfully submitted


                                                                  yz
                                              Glenn A Steitz
                                              Senior Manager
                                              Demonstrations and New Technology
                                              Introduction



Document Created: 2019-04-28 02:30:05
Document Modified: 2019-04-28 02:30:05

© 2026 FCC.report
This site is not affiliated with or endorsed by the FCC