THIRD SIXTH MONTH PROGRESS REPORT

0050-EX-ML-2003 Post Grant Documents

AMBIENT CORPORATION

2005-03-03ELS_69555

                                          Tel   202 955 3000    Holland & Knight LLP
                                          Fax 202 955 5564     2099 Pennsylvania Avenue, NW., Suite 100
                                                               Washington, D.C. 20006
                                                               www.hklaw.com




March 3, 2005
                                                                   GEORGE WHEELER
                                                                   202—457—7073
                                                                   gwheeler@hklaw.com
VIA ELECTRONIC SUBMISSION

Office of Engineering and Technology
Experimental Licensing Branch, MS 1300E1
Federal Communications Commission
445 12t" Street, S.W.
Washington D.C. 20054

              Re: Submission of Progress Report
                  Call Sign WD2XEQ, File No. 0050—EX—ML—2003

Gentlemen:

    In accordance with the terms of its Experimental License, Call Sign
WD2XEQ ("License"), Ambient Corporation ("Ambient") is filing the attached six—
month progress report ("Report") on its progress in evaluating the feasibility of
broadband access via carrier current systems over power lines.

       If there are any questions regarding the submission, please contact George Y.
Wheeler, Esq. at (202) 457—7073. For technical questions concerning the Report itself,
contact Dr. Yehuda Cern, Ambient‘s Chief Engineer, at (617) 332—7680.




                                      * George Y. Wheéler /
                                        Counsel for Ambiert Corporation
Enclosure


# 2663077v1


                                                                 Call Sign WD2XEQ
                                                          File No. 0050-EX-ML-2003

          PROGRESS REPORT OF AMBIENT CORPORATION'S TESTS
                           PURSUANT TO
                      EXPERIMENTAL LICENSE


      Ambient Corporation ("Company") submits this six-month progress report in
accordance with the conditions of its Experimental License to evaluate broadband
access via carrier current systems over power lines.

                                   *       *     *

Test Sites: The Company has continued its ongoing test program at its test site in
Westchester County, New York since the grant of its original STA in June 2002.
During the past six months the Company expanded its network in Westchester
County, providing the Consolidated Edison with telemetry from its distribution
lines and providing a network capacity to meet the needs of residents for broadband
data services.

The MV/LV test system with Orange and Rockland Utilities Inc. ("O&R") at
Monsey, New York reported in the company's previous Progress Report is
unchanged and remains in operation. At this installation Ambient received
a report of interference from a licensed operator in 37.0 - 37.5 MHz band.
The Company was able to "notch out" BPL system transmission in this frequency
band which solved the interference problem.

Testing of the in-building LV demonstration system at the offices of IDACOMM,
Inc. in Boise, Idaho for broadband Internet access capabilities reported in the
Company's previous Progress Report is continuing.

In February of 2005, the Company set up an in-building Low Voltage demonstration
system at a 200 unit high-rise apartment building in New York, NY, to test and
demonstrate broadband internet access capabilities.

BPL Standards Development: Members of the Company's engineering staff have
taken their experience gained from the Company's extensive testing program to
assist in the development of interoperability standards for access and in-building
Broadband over Power Line (BPL) technologies in the following IEEE working
groups:




                                       1


Dr. Yehuda Cern, its Chief Engineer, was chosen as a Chair of the Hardware Task
Group for the BPL Hardware Safety Standard Working Group which is developing
"Standard for Broadband over Power Line Hardware and Personnel Safety."

Aron Viner, its Principal RF Engineer, was chosen as a Chair of the PLC EMC
Standard Working Group which will develop the Standard "Powerline
Communication Equipment. Electromagnetic Compatibility (EMC) requirements.
Testing and Measurement methods".

Ram Rao, its Chief Network Architect, became a member of the BPL MAC/ PHY
Standard Working Group which will develop "Standard for Broadband over Power
Line Networks: Medium Access Control and Physical Layer Specifications."

Testing of Advanced Hardware and Software Capabilities: In the framework of its
Experimental License, the Company continues to develop and test methods for
enhancing the performance of its BPL systems and to monitor and adjust the
parameters of its test facilities to be responsive to the concerns of the Amateur radio
operators consistent with its obligations under its Experimental License.

The Company is now testing operations on underground distribution plant in the
Westchester County area in addition to on-going testing of overhead plant.

The Company has made additional advances in its software which controls the
frequency mask for radiated emissions in licensed radio bands. These new releases
are more stable than prior releases and provide improved performance to assure at
least 20 dB notching capabilities for interference mitigation.

As previously reported to the Commission, the Company has notched out its signals
on Amateur bands, demonstrating significant advancements in our technology over
the relatively short time period of its test program. These bands include the
following Amateur Radio bands: 80, 40, 30, 20, 15 and 10 meters: 3.5-4 MHz, 7-7.3
MHz, 10.1-10.15 MHz, 14.0- 14.35 MHz, 21-21.45 MHz and 28.0-29.7 MHz.

The Company has also made improvements in the design of its devices to enhance
shielding of undesired radiated emissions and to optimize power levels which
comply with Part 15 limits.



March 3, 2005



# 2222864_v1




                                       2