ACS(US) Inc

1332-EX-ST-2018

Status: Pending

N/A
2018-07-26

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Aug 10 2018]Correspondence2018-08-10
Grant E-mail Notification generated [Sep 25 2018]Correspondence2018-09-25
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  ACS(US) Inc

Address
Attention: Mark Gullett
Street Address: 4600 Trailside Loop
P.O. Box:
City: Castle Rock
State: CO
Zip Code: 80109
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Hibbeler
First Name: Richard
Title: Manager
Phone Number: 7037265671

Explanation
Please explain in the area below why an STA is necessary:
To test/demonstrate wireless technologies on an interim basis. the testing will be indoors

Purpose of Operation
Please explain the purpose of operation:  The experimental spectrum is being requested for the purpose of testing 5G aligned technology in a manufacturing setting. The testing is targeted to use a LTE enabled Radio supported by a MEC (Multi-access Edge Computing) device co-located with the Radio. The testing is focused on enabling highly secure & reliable bearer traffic breakout behind in building and/or campus radio deployments. This deployment is to support intranet connectivity for LTE enabled IOT, Smart Devices, Standard UEs (User Equipment), positioning capabilities, and related use cases

Information
Callsign: WN9XIO
Class of Station: FX MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 08/14/2018
Operation End Date: 02/10/2019

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Various NA 6 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Mark Gullett
Title of Applicant (if any): Authorized Representative
Date: 2018-07-25 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Ridley Park Pennsylvania North  39  52  4 West  75  19  18 0.40
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 699.00000000-716.00000000 MHz MO 63.100000 W 100.000000 W P 0.00100000 % 10M0D7W FDD
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 729.00000000-746.00000000 MHz FX 63.100000 W 100.000000 W P 0.00100000 % 10M0D7W FDD
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1850.00000000-1910.00000000 MHz MO 63.100000 W 100.000000 W P 0.00100000 % 10M0D7W FDD
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1930.00000000-1990.00000000 MHz MO 63.100000 W 100.000000 W P 0.00100000 % 10M0D7W FDD

19191

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC