Special Temporary Authority application - Applicant Name
Name of Applicant:
AT&T Services, Inc.
Special Temporary Authority application - Best Contact
First Name:
David
Last Name:
Wolter
Phone Number:
512-372-5818
Title:
AVP - Radio Technology & Architecture
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2019-09-19 00:00:00.0
Signature of Applicant (Authorized person filing form):
David Wolter
Title of Applicant (if any):
AVP - Radio Technology & Architecture
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
The industry organization 3rd Generation Partnership Project (“3GPP”) completed the R15 NR specifications in June 2018, which together with 3GPP final NR specifications in Release 16, has been submitted for consideration as an IMT 2020 Radio Interface Technology at the July 2019 ITU-R WP5D meeting. 5G systems provide low latency multi-gigabyte per-second (Gbps) mobile and fixed broadband services. AT&T seeks the STA to further demonstrate the advanced applications and services possibilities in the requested mmWave frequency band.
Special Temporary Authority application - Information
Callsign:
WP9XIB
Class of Station:
FX MO
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
Applicant’s 5G demonstrations will involve communications between up to three (3) fixed (FX) base station antennas and up to twenty (20) user equipment (UE) units placed within 100 meters of the base station antennas. The base station and the UE antennas will be placed outdoors at a height of less than four (4) meters in front of the Casino property located at 3790 Las Vegas Boulevard South as shown in the maps below. The red dot in the map below indicates the location of the base stations, which will have connectivity to an internal server to provide content over the 5G air interface for the purposes of this demonstration.
Special Temporary Authority application - Initial values - Requested Period of Operation
Operation Start Date:
10/01/2019
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
Yes
Equipment 1 Manufacturer
Multiple
Equipment 1 Model Number
Experimental
Equipment 1 No. Of Units
23
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
5G demonstrations will involve communications between up to 3 fixed (FX) base station antennas (BSes) and up to 20 user equipment (UE) units placed within 100 meters of the BSes. The base station and the UE antennas will be placed outdoors at a height of less than four (4) meters in front of the Casino property located at 3790 Las Vegas Boulevard South as shown in the maps below. The red dot in the map below indicates the location of the base stations, which will have connectivity to an internal server to provide content over the 5G air interface for the purposes of this demonstration.
Special Temporary Authority application - Requested Period of Operation