Special Temporary Authority application - Applicant Name
Name of Applicant:
L-3 Communications
Special Temporary Authority application - Best Contact
First Name:
Dan
Last Name:
Koehler
Phone Number:
5053444436
Title:
Electrical Engineer
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2012-09-05 00:00:00.0
Signature of Applicant (Authorized person filing form):
Daniel R. Koehler
Title of Applicant (if any):
Electrical Engineer
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
The testing is for a one-time experimental setup with a target startup of 15 Oct 2012. After a few months of testing, the equipment will be shipped overseas.
Special Temporary Authority application - Information
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Requested Period of Operation
Operation End Date:
03/15/2012
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
Yes
Equipment 1 Manufacturer
Raytheon
Equipment 1 Model Number
MK2 1000
Equipment 1 No. Of Units
1
Equipment 2 Experimental
Yes
Equipment 2 Manufacturer
Aviat Networks
Equipment 2 Model Number
Eclipse ODU 300
Equipment 2 No. Of Units
1
Equipment 3 Experimental
Yes
Equipment 3 Manufacturer
Motorola
Equipment 3 Model Number
APX 7000
Equipment 3 No. Of Units
1
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
There will be three transmitting antenna systems to test: a radar application, a microwave radio application, and a VHF radio application. The three antenna systems will be operated together to make sure that no system interferes with another system. Radar system information: Raytheon MK2 1000 Ocean Surveillance Radar Operating frequency: 9.410GHz +/- 30 MHz Emission designator: 100MP0N Peak output power: 25,000W Maximum effective power out is 15 during the long pulse Antenna will be 40 feet above ground level (AGL) Microwave radio information: Aviat Networks Eclipse ODU 300 RFU Unit Antenna length: 1.5 m Antenna will be 30 feet AGL. Operating frequencies: 10.915 GHz to 11.075 GHz, and 11.430 GHz to 11.585 GHz VHF radio information: Motorola APX 7000 Multiband portable radio Antenna will be 40 feet AGL. Operating frequencies: 134 to 176 MHz (including marine radio service around 156 MHz)
Special Temporary Authority application - Requested Period of Operation