Experimental Licensing System

0594-EX-ST-2017

Georgia Institute of Technology

Experimental Licensing System filing 0594-EX-ST-2017 submitted by Georgia Institute of Technology.

Filing overview

StatusDenied/Dismissed
Call signN/A
Date filed2017-05-10
Status date2017-06-15
FCC sourceView the FCC filing record

Special Temporary Authority application - Address

Attention:
Office of Legal Affairs
City:
Atlanta
E-Mail Address:
asklegal@gatech.edu
State:
GA
Street Address:
760 Spring Street, NW, Suite 324
Zip Code:
30332-0495

Special Temporary Authority application - Applicant Name

Name of Applicant:
Georgia Institute of Technology

Special Temporary Authority application - Best Contact

First Name:
Patrick
Last Name:
Buckley
Phone Number:
256-716-2159
Title:
Research Scientist II

Special Temporary Authority application - Certification

Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2017-05-08 00:00:00.0
Signature of Applicant (Authorized person filing form):
Patrick J. McKenna
Title of Applicant (if any):
Vice President - Legal Affairs & Risk Mgt.

Special Temporary Authority application - Explanation

Please explain in the area below why an STA is necessary:
The application seeks an STA to operate a digital telemetry transmitter and receiver test network for the purpose of observing the behavior of a tactical telemetry kit. A single digital transmitter will be installed on a small UAS during flight tests at Elliot Field in Dawsonville, GA. A single digital receiver will be installed in a fixed location at the same location. A small single-board computer (National Instruments sbRIO-9627) will produce analog playback of real analog data from the HAWK Missile, which will be digitized prior to transmission. Transmission will occur within the 2.2-2.4 GHz frequency range. Data recorded by the digital receiver will be analyzed to evaluate the impact of multipath, interference, and other propagation impairments. Test objectives include selection of optimum transmit frequency, evaluation of A/D hardware, and evaluation of the range of the transmit/receive pairing.

Special Temporary Authority application - Information

Class of Station:
MO
Nature of Service:
Experimental

Special Temporary Authority application - Initial values - Explanation

Please explain in the area below why an STA is necessary:
The application seeks an STA to operate a digital telemetry transmitter and receiver test network for the purpose of observing the behavior of a tactical telemetry kit. A single digital transmitter will be installed on a small UAS and small-scale rocket during separate tests at Elliot Field in Dawsonville, GA. A single digital receiver will be installed in a fixed location at the same location. A small single-board computer (SBC; National Instruments sbRIO-9627) will produce analog playback of real analog data from the HAWK Missile, which will be digitized prior to transmission. Transmission will occur within the 2.2-2.4 MHz bandwidth. Data recorded by the digital receiver will be analyzed to evaluate the impact of multipath, interference, and other propagation impairments. Test objectives include selection of optimum transmit frequency, evaluation of the A/D hardware, and evaluation of the range of the transmit/receive pairing.

Special Temporary Authority application - Manufacturer

Equipment 1 Experimental
No
Equipment 1 Manufacturer
Quasonix
Equipment 1 Model Number
QSX-VSR2
Equipment 1 No. Of Units
1

Special Temporary Authority application - Purpose of Operation

Please explain the purpose of operation:
This test will provide configuration confidence prior to deploying the transmitter, A/D, antenna, and receiver system during a live-fire test of the HAWK missile.

Special Temporary Authority application - Requested Period of Operation

Operation End Date:
12/14/2017
Operation Start Date:
06/15/2017

Frequencies

ActionLower MHzUpper MHzClassOutput WERP WEmissionSignal
NewMO5.00000010.0000002G30F1DFM
New2200.500000002394.50000000MO5.00000010.000000F1DFM

Sites

SiteLocationCoordinatesOperating areaCountyRadius
North 34 27 32 West 84 10 52Elliot Field, Dawson County GA15.00

Sources and provenance

SourceSource recordRetrievedMatch
ELS0594-EX-ST-20172026-07-30 08:57:11Source Primary
Selected field provenance
FieldDisplayed valueSourceObserved
StatusDenied/DismissedELS 0594-EX-ST-20172026-07-30 08:57:11
Applicant NameGeorgia Institute of TechnologyELS 0594-EX-ST-20172026-07-30 08:57:11
Call SignN/AELS 0594-EX-ST-20172026-07-30 08:57:11
Receipt Date2017-05-10ELS 0594-EX-ST-20172026-07-30 08:57:11
Status Date2017-06-15ELS 0594-EX-ST-20172026-07-30 08:57:11

Documents

DocumentTypeDateStatus
Dismissal Without Prejudice generated [Jun 15 2017]Correspondence2017-06-28Available
Incoming generated [Jun 14 2017]Correspondence2017-06-14Available
Incoming generated [May 18 2017]Correspondence2017-05-18Available
E-Mail generated [May 18 2017]Correspondence2017-05-18Available
E-Mail generated [May 12 2017]Correspondence2017-05-12Available
Necessary Bandwidth DescriptionImages2017-05-10Available
Fee ExemptionImages2017-05-10Available
E-Mail generated [May 10 2017]Correspondence2017-05-10Available