StatusGrant Expired Due to New License
Call signWD9XGQ
Date filed2008-03-21
Status date2008-04-03
FCC sourceView the FCC filing record

Special Temporary Authority application - Address

Attention:
Robert S Gammenthaler
City:
Plano
E-Mail Address:
president@moonsociety.org
P.O. Box:
PO Box 940825
State:
TX
Zip Code:
75094

Special Temporary Authority application - Applicant Name

Name of Applicant:
Moon Society, Inc

Special Temporary Authority application - Best Contact

First Name:
Charles
Last Name:
Radley
Phone Number:
503-579-4686
Title:
Vice President

Special Temporary Authority application - Certification

Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2008-03-16 00:00:00.0
Signature of Applicant (Authorized person filing form):
Charles F. Radley
Title of Applicant (if any):
Vice President

Special Temporary Authority application - Explanation

Please explain in the area below why an STA is necessary:
The Moon Society plans to operate an experimental one watt ISM device for a low power 2.5 GHz beaming demonstration at a public event in Washington DC, May 2008. Prior to this event, Moon Society plans to test the device at contractor workshop in Oregon, USA. Subsequent operation might be requested at other public events, e.g. Denver in August 2008.

Special Temporary Authority application - Information

Callsign:
WD9XGQ
Class of Station:
MO
Nature of Service:
Experimental

Special Temporary Authority application - Initial values - Manufacturer

Equipment 3 Experimental
No
Equipment 3 Manufacturer
o
Equipment 3 Model Number
o

Special Temporary Authority application - Initial values - Purpose of Operation

Please explain the purpose of operation:
The Moon Society plans to operate an experimental one watt ISM device for a low power 2.5 GHz beaming demonstration at a public event in Washington DC, May 2008. Prior to this event, Moon Society plans to test the device at contractor workshop in Oregon, USA. Project Definition This project will be conducted in three phases: Phase 1 In Phase 1, a design for the table top demo system will be developed and cost estimates prepared for the remaining Phases. Specific tasks to be accomplished include: Prepare electronics block diagram. Determine sources and pricing for off-the-shelf electronic components. Identify components that are not available off-the-shelf. Create designs for components that must be custom made and conduct simulations of proposed designs to verify expected performance. Obtain quotes to fabricate custom-made components. Perform calculations and simulations and conduct measurements on selected components to predict overall system performance. Design the stand(s) and display components. Obtain cost estimates and or quotes to construct stand(s) and display components. Prepare cost estimates and budgets to complete Phases 2 and 3. Phase 2 In Phase 2, one complete working prototype of the system will be constructed and performance will be measured to verify that project goals are met. On completion of Phase 2, the prototype will be available for use as a demonstrator. It is likely that a small quantity of the custom made parts will be obtained at the same time as the prototype parts to gain more favorable pricing.

Special Temporary Authority application - Manufacturer

Equipment 1 Experimental
No
Equipment 1 Manufacturer
Teletronics
Equipment 1 Model Number
12-213
Equipment 1 No. Of Units
1
Equipment 2 Experimental
No
Equipment 2 Manufacturer
HyperLink Technologies
Equipment 2 Model Number
RE14P-RSP
Equipment 2 No. Of Units
1

Special Temporary Authority application - Purpose of Operation

Please explain the purpose of operation:
To demonstrate beaming technology. The Moon Society plans to operate an experimental one watt ISM device for a low power 2.5 GHz beaming demonstration at a public event in Washington DC, May 2008. Prior to this event, Moon Society plans to test the device at contractor workshop in Oregon, USA. Project Definition This project will be conducted in three phases: Phase 1 In Phase 1, a design for the table top demo system will be developed and cost estimates prepared for the remaining Phases. Specific tasks to be accomplished include: Prepare electronics block diagram. Determine sources and pricing for off-the-shelf electronic components. Identify components that are not available off-the-shelf. Create designs for components that must be custom made and conduct simulations of proposed designs to verify expected performance. Obtain quotes to fabricate custom-made components. Perform calculations and simulations and conduct measurements on selected components to predict overall system performance. Design the stand(s) and display components. Obtain cost estimates and or quotes to construct stand(s) and display components. Prepare cost estimates and budgets to complete Phases 2 and 3. Phase 2 In Phase 2, one complete working prototype of the system will be constructed and performance will be measured to verify that project goals are met. On completion of Phase 2, the prototype will be available for use as a demonstrator. It is likely that a small quantity of the custom made parts will be obtained at the same time as the prototype parts to gain more favorable pricing.

Special Temporary Authority application - Requested Period of Operation

Operation End Date:
09/15/2008
Operation Start Date:
04/15/2008

Frequencies

ActionLower MHzUpper MHzClassOutput WERP WEmissionSignal
0.01
0.01
0.01
StateRadius of Operation
New2492.000000002492.00000000MO1.0000001.0000000H00X0Nnone
Modified2492.000000002492.00000000MO1.0000001.0000000H00X0Nnone

Sites

SiteLocationCoordinatesOperating areaCountyRadius
North WestIndoor operation at public event
North 45 31 24 West 122 51 57Build up testing in Beaverton, O0.01

Grant actions

DateCategoryDescription
2008-04-03GrantGrant Generated [Apr 3, 2008]

Sources and provenance

SourceSource recordRetrievedMatch
ELS0143-EX-ST-20082026-07-30 08:56:22Source Primary
Selected field provenance
FieldDisplayed valueSourceObserved
StatusGrant Expired Due to New LicenseELS 0143-EX-ST-20082026-07-30 08:56:22
Applicant NameMoon Society, IncELS 0143-EX-ST-20082026-07-30 08:56:22
Call SignWD9XGQELS 0143-EX-ST-20082026-07-30 08:56:22
Receipt Date2008-03-21ELS 0143-EX-ST-20082026-07-30 08:56:22
Status Date2008-04-03ELS 0143-EX-ST-20082026-07-30 08:56:22

Documents

DocumentTypeDateStatus
Request for one additional antenna locationPost Grant Documents2008-04-13Available
Amendment to additional antenna locationPost Grant Documents2008-04-13Available
Antenna DescriptionImages2008-03-21Available
Antenna descriptionImages2008-03-21Available
View GrantPending archive